Streamlining Access in a Rotherham Production Facility

A&C Maintenance Ltd was awarded the contract to replace the clients existing ageing & damaged high speed doors.

The contract involved dismantle & removal from site of the existing doors and supply & installation of
eight 3500mm(W) x 5000mm(H) Instant Pass Fold Up Doors complete with automatic operation by induction loops to both sides of the opening and a number of vision panels to each curtain.
High Speed Fold Up Door in yellow
Our client wanted peace of mind when awarding the order. The project was managed by A&C Maintenance Ltd from start to finish. This included supply & installation of secondary steelwork and builders work. Including cutting and back filling of loop slots, removal of kerbs, concreting and provision of protection bollards.

Need a quote for a job?

Leave your details with us and we will contact you very shortly.
Preferred contact
Definitely an A&C Maintenance service engineer
acm logo symbol red

Problem with your door?
Call our free 24/7 hotline

acm logo symbol red
© 2026 A&C Maintenance Ltd.

Company number: 01186680
Registered office: Unit 11b Monksbridge Trading Estate, Outgang Lane, Dinnington Sheffield, South Yorkshire, S25 3QX

dhf logo for ultimate fire security
DHF Accredited

This is a low carbon Instadesign website hosted using 100% renewable energy.